Linear Silver Module For Precision Ball Screw Linear Sliding Table Guide Rail SFUR2010

1. High precision

The production of ball screw includes grinding, assembly and inspection of the factory environment of each process. The production has very strict control over temperature and humidity. A perfect quality management system is a sufficient guarantee for the accuracy of the ball screw.


2. Small friction loss and high transmission efficiency

Since there are many rolling balls between the screw shaft and the screw nut of the ball screw, it can obtain high motion efficiency. It is more favorable in saving energy consumption. Compared with the conventional sliding screw, the driving torque can reach less than one-third, that is, the ball screw requires only one-third of the power required to achieve the same motion results.


3. High axial rigidity

The ball screw can be preloaded, because the preload can make the axial clearance reach a negative value, so as to obtain higher rigidity, the ball screw is preloaded by the ball, in the actual application of the mechanical device, because the ball The repulsive force enables rigidity to be enhanced.


4. High-speed feeding and micro-feeding possible

Since the ball screw is moved by the ball screw, the starting moment of the ball screw is quite small, there will be no crawling like sliding motion, and accurate micro-feeding can be guaranteed.



Price
$1.00
  Contact Now E-Mail Telephone WhatsApp
Product Details

Ball screw is a precision component composed of screw, nut and ball. It has high precision and low frictional resistance. It is widely used in various industrial equipment and precision instruments.


 Hed592fbcbdd241f0a29ef20946e74607T.jpg


Overview

  1.Essential details

Applicable IndustriesIndustrial machinery, aerospace industry, building materials store, manufacturing plant, machinery repair shop, etc.

Structure

Trapezoidal Screw
Weight (KG)5.5
Model NumberSFUR2010
Service24 hours service
MaterialBearing steel
SizeCustomized Size

  2. Packaging & delivery

PortQingdao/Guangzhou 
Lead time3-10 days

  3. Video Description

Leave your messages

Related Products

Popular products